A. 期刊論文 1. Chiuh-Cheng Chyu;Ying-Chieh Fang, 'A Hybrid Fuzzy Analytic Network Process Approach to the New Product Development Selection Problem', Mathematical Problems in Engineering, Vol. 2014, No. 485016, pp. 1~13(2014/06) |
2. Ying-Chieh Fang;Chiuh-Cheng Chyu, 'A Multicriteria Selection Model for Developing New Color Calibration Device', TELKOMNIKA Indonesian Journal of Electrical Engineering, Vol. 12, No. 3, pp. 2374~2383(2014/03) |
3. Ying-Chieh Fang;Chiuh-Cheng Chyu, 'Evaluation of New Product Development Alternatives Considering Interrelationships among Decision Criteria', Journal of Multimedia, Vol. 9, No. 4, pp. 611~617(2014/04) |
4. I-Ping;Chiuh-Cheng Chyu, Designing Economic Inspection Sampling Procedure with Bayesian ApproachAdvanced Materials Research, 711, pp. 633~688(2013) |
5. I-Ping Huang;Chiuh-Cheng Chyu, 'A wholesale price-based coordination scheme to optimize supplier profit in newsvendor problems', Journal of Applied Sciences, Vol. 13, No. 21, pp. 4812~4818(2013/11) |
6. Li-Jun Zhu;Yeong-Cheng Liou;Yonghong Yao;Chiuh-Cheng Chyu, 'Algorithmic and Analytically Approaches to the Split Feasibility Problems and Fixed Point Problems', Taiwanese Journal of Mathematics, Vol. 17, No. 5, pp. 1839~1853(2013/10) |
7. I-Ping Huang;Chiuh-Cheng Chyu, 'An Improvement Inspection Policy for C2F6 gas used in semiconductor manufacturing', Applied Mechanics and Materials, Vol. 389, No. NA, pp. 175~182(2013/08) |
8. I-Ping Huang;Chiuh-Cheng Chyu, 'An interactive newsvendor model involving market risk and product quality risk', Advanced Materials Research, Vol. 739, No. NA, pp. 694~699(2013/08) |
9. Chiuh-Cheng Chyu;I-Ping Huang, 'Coordination Scheme for Restructuring Business Operation of the Single Period Newsvendor Problem', Mathematical Problems in Engineering, Vol. 2013, No. 308187, pp. 1~11(2013/11) |
10. Yonghong Yao;Yeong-Cheng Lio;Chiuh-Cheng Chyu, 'Fixed points of pseudocontractive mappings by a projection method in Hilbert spaces', Journal of Nonlinear and Convex Analysis, Vol. 14, No. 4, pp. 785~794(2013/10) |
11. Ying-Chieh Fang;Chiuh-Cheng Chyu, 'Selection of Developig Color Calibration Device Based on Fuzzy Delphi and Dematel-ANP', Information Technology Journal, Vol. 12, No. 22, pp. 6570~6576(2013/12) |
12. Zhi-Jie Chen;Chiuh-Cheng Chyu, Solving the Resource Constrained Project Scheduling Problem to Minimize the Financial Failure RiskInternational Journal of Advanced Research in Artificial Intelligence, 1, pp. 42~47(2012) |
13. Chiuh-Cheng Chyu;Wei-Shung Chang, Hybrid Metaheuristics for the Unrelated Parallel Machine Scheduling to Minimize Makespan and Maximum Just-in-Time DeviationsInternational Journal of Advanced Research in Artificial Intelligence, 1, pp. 7~13(2012) |
14. Wei-Shung Chang;Chiuh-Cheng Chyu, An efficient and cost-saving component scheduling algorithm using high speed turret type machines for a board containing multiple PCBsIntelligent Control&Automation, 2, pp. 86~94, 201105 |
15. Chiuh-Cheng Chyu;W.-S. Chang, Optimizing fuzzy makespan and tardiness for unrelated parallel machine scheduling with archived metaheuristicsInternational Journal of Advanced Manufacturing Technology, 57, pp. 763~776(2011) |
16. Angela H.L. Chen;Chiuh-Cheng Chyu, A memetic algorithm for multi-objectives resource allocation problemsJournal of Statistics & Management Systems, 14, pp. 537~553, 201105 |
17. Angela H.L. Chen;C. C. Chyu, Economic optimization of the resource-constrained project scheduling: a two-phase metaheuristic approach, Journal of Zhejiang University-SCIENCE C, 11(6),pp.481-494, 201005 |
18. Zhi-Jie Chen;C. C. Chyu, A dual-population memetic algorithm for minimizing total cost of multi-mode resource-constrained project scheduling, Industrial Engineering & Management Systems, 9(2),pp. 70-90, 201006 |
19. Zhi-Jie Chen;C. C. Chyu, An evolutionary algorithm with multi-local search for the resource-constrained project scheduling problem, Intelligent Information Management, 2,pp. 220-226, 201003 |
20. C. C. Chyu,Wei-Shung Chang, Pareto Evolutionary Algorithm Approach to the Bi-objective Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Times, International Journal of Advanced Manufacturing Technology, 49(4-5),pp. 697-708, 201007 |
21. Angela H.L. Chen;Chiuh-Cheng Chyu, Applying Memetic Algorithm in Multi-objective Resource Allocation among Competing ProjectsJournal of Software, 5, pp. 802~809, 201008 |
22. Chiuh-Cheng Chyu;I-Ping Huang, Supplier and Producer Profit Sharing Models Based on Inspection Sampling PolicyJournal of Service Science and Management, 3, pp. 479~486, 201012 |
23. Chiuh-Cheng Chyu;Zhi-Jie Chen,Scheduling jobs under constant period by period resource availability to maximize project profit at a due date,International Journal of Advanced Manufacturing Technology,Vol. 42,pp. 569-580,200905 |
24. Chiuh-Cheng Chyu;Wei-Shung Chang,Multi-Exchange Neighborhood Search Heuristics for the Multi-Source Capacitated Facility Location Problem,Industrial Engineering and Management Systems,Vol. 8, No. 1, pp. 29-36,200905 |
25. Wei-Shung Chang;Chiuh-Cheng Chyu;Jian- Rong Cheng,基因演算法於多目標TFT-LCD模組廠排程問題之研究,先進工程學刊 (Journal of Advanced Engineering),Vol. 4 No. 3,pp. 289-294,200907 |
26. Wei-Shung Chang;C. C. Chyu, A Multi-Criteria Decision Making for the Unrelated Parallel Machines Scheduling Problem, Journal of Software Engineering and Applications, 2,pp. 323-329, 200912 |
27. Ying-Chieh Fang;C. C. Chyu, A Looping Population Learning Algorithm for the Makespan Resource Trade-offs Project Scheduling, Industrial Engineering and Management Systems, 8(3),pp. 171-180, 200909 |
28. Chiuh-Cheng Chyu;Wei Shung Chang,A genetic-based algorithm for the operational sequence of a high speed chip placement machine,International Journal of Advanced Manufacturing Technology,36(9-10),pp.918-926,200803 |
29. C.-C. Chyu and I.-C. Yu, “A Bayesian Analysis of the Deming Cost Model with Normally Distributed Sampling Data,” Quality Engineering (EI), 18-2, 2006. |
30. Yun-Chia Liang, Angela H.L. Chen, Chiuh-Cheng Chyu, Application of a Hybrid Ant Colony Optimization for the Multilevel Thresholding in Image Processing,Lecture Notes in Computer Science,(期別:vol. 4233,pp.1183-1192),2006/10 |
31. F.-C. Wu and C.-C. Chyu, “Optimization of Correlated Multiple Quality Characteristics Robust Design Using Principal Component Analysis,” Journal of Manufacturing Systems (EI, SCI), Vol. 23, No. 2, 134-143, 2004. |
32. F.-C. Wu and C.-C. Chyu, “Optimization of Robust Design for Multiple Quality Characteristics,” International Journal of Production Research (EI, SCI), Vol. 42, No. 2, pp. 337-354, 2004. |
33. W.-S. Chen and C.-C. Chyu, “A Minimum Setup Strategy for Sequencing PCBs with Multi-Slot Feeders,” Integrated Manufacturing Systems: The International Journal of Manufacturing Technology Management (EI), Vol. 14, No. 3, 2003. |
34. 2.C.-C. Chyu and F.-C. Wu, “Bayesian analysis on Deming’s model with consideration of inspection errors,” International Journal of Advanced Manufacturing Technology (EI, SCI), 20:660-663, 2002. |
35. F.-C. Wu and C.-C. Chyu, “A comparative study on Taguchi's SN ratio, minimizing MSD and Variance for Nominal-The-Best Characteristic,” International Journal of Advanced Manufacturing Technology (EI, SCI), 20:655-659, 2002. |
36. W.-S. Chen and C.-C. Chyu, “Reduction of Printed Circuit Board Group Assembly Time Through the Consideration of Efficiency Loss of Placement Time, “ Assembly Automation (EI,SCI), Vol. 22, No. 4, 2002. |
37. C. C. Chyu, "A Mixed Strategy Heuristic for the Mixed Arc Routing Problem," Journal of the Chinese Institute of Industrial Engineers, Vol. 18, No. 3, May, 2001. |
B. 會議論文 1. 林姵妏;陳怡婷;Chiuh-Cheng Chyu,運用分析網路程序法於外包供應商評選之研究 - 以LED圖案畫藍寶石基板為例,2014 工業工程年會暨學術研討會 ( 2014/08 ) |
2. 蕭人豪;陳怡婷;賴慶育;Chiuh-Cheng Chyu,應用多準則決策於太陽能矽晶圓供應商評選準則之研究,2014第十屆台灣作業研究學會年會暨海運物流學術研討會 ( 2014/08 ) |
3. 吳智堯;黃芷筠;李玥玟;Chiuh-Cheng Chyu,應用教師學習演算法解算兩目標資源限制專案排程問題,2014第十屆台灣作業研究學會年會暨海運物流學術研討會 ( 2014/08 ) |
4. 王俐心;劉曜全;方英傑;Chiuh-Cheng Chyu, 應用多準則決策分析結合品質機能展開選擇電動自行車之電池模組, 中華決策科學學會103年度會員大會暨管理科學決策學術研討會(2014) |
5. Chiuh-Cheng Chyu;I-Ping Huang, Newsvendor Supply Chain with Markdown Money Policy and Revenue Sharing Policy for Risk-averse Retailer and Risk-neutral Supplier, The 3rd International Congress on Natural Sciences and Engineering(2014) |
6. Ying-Chieh Fang;Chiuh-Cheng Chyu, Selection of New Product Development Using the Analytic Network Process and Fuzzy Integral – A Case Study, The 3rd International Congress on Natural Sciences and Engineering(2014) |
7. 王仁照;方英傑;Chiuh-Cheng Chyu, 模糊多準則決策應用於照相模組鏡頭製程之選擇, 中華決策科學學會103年度會員大會暨管理科學決策學術研討會(2014) |
8. I-Ping Huag;Chiuh-Cheng Chyu, An Interactive Newsvendor Model Involving Market Risk and Product Quality Risk, 2013World Congress on lndustrial Materials-Applications, Products, and Technologies(WCIM2013)(2013) |
9. 方英傑;林明俊;Chiuh-Cheng Chyu, 醫療螢幕校色器產品研發之決策分析, 2013第九屆台灣作業研究學會年會暨學術研討會(2013) |
10. 林明瑩;侯婉婷;Chiuh-Cheng Chyu, 離散型分解策略粒子群最佳化演算法求解兩目 標資源限制專案排程問題之研究, 2013第九屆台灣作業研究學會年會暨學術研討會(2013) |
11. 林業盛;方英傑;Chiuh-Cheng Chyu, 應用 ANP 於數位單眼相機產品評價之研究, 觀光休閒決策學術研討會(2013) |
12. 鄒沛成;方英傑;Chiuh-Cheng Chyu, 多準則決策模式之比較分析 - 以都會區供水為個案探討, 觀光休閒決策學術研討會(2013) |
13. I-Ping Huang;Chiuh-Cheng Chyu, An Improvement Inspection Policy for C2F6 gas used in Semiconductor Manufacturing, 2013 International Conference on Mechatronic, Systems and Materials Applications (ICMSMA 2013)(2013) |
14. Wei-Shung Chang;Chiuh-Cheng Chyu;Mao-Jia Huang, Solving Unrelated Parallel Machine Scheduling with Makespan and Just-in-time Minimization Objectives, 2012 International Symposium on Semiconductor Manufacturing Intelligence(2012) |
15. 張玟源;魏名晨;Chiuh-Cheng Chyu, 應用分析網路程序法於頻率控制元件研發方案之決策分析, 第十五屆決策分析研討會(2012) |
16. Chiuh-Cheng Chyu;Wei-Shung Chang, A Dual-Archive Memetic Algorithm for Unrelated Parallel Machine Scheduling to Minimize Total Weighted Flow Time and Weighted Tardiness, 14th IFAC Smposium on Information Control Problems in Manufacturing; INCOM2012(2012) |
17. 林明瑩;Chiuh-Cheng Chyu;陳芝傑, 非相同平行批次處理機台總完工時間最小化問題求解之研究, 第十一屆中華決策科學學會年會與學術研討會(2012) |
18. 廖姵婷;Chiuh-Cheng Chyu;陳芝傑, 報童供應鏈模式利潤分享政策之研究, 第十一屆中華決策科學學會年會與學術研討會(2012) |
19. 林明瑩;Chiuh-Cheng Chyu, 層級式演算法於多目標彈性零工型排程求解之研究, 2012工業工程學術研討會(2012) |
20. 陳芝傑;方英傑;Chiuh-Cheng Chyu, 貪婪隨機調適搜尋法於資源限制專案排程現金流量風險最小化問題求解之研究, 2012工業工程學術研討會(2012) |
21. 林聖芬;Chiuh-Cheng Chyu, 考量市場與品質風險下供應鏈廠商利潤分享模式之研究, 第七屆台灣作業研究學會年會暨學術研討會, 201106 |
22. Chiuh-Cheng Chyu;Z-J Chen, GRASP for maximizing cash availability in resource-constrained project scheduling, Proceedings of the 41st International Conference on Computers & Industrial Engineering(2011) |
23. Sheng-Fen Lin;Chiuh-Cheng Chyu;Pei-Ting Liao, Business operating strategy for newsvendor problems considering market demand uncertainty and product quality risk, 2011 International Symposium of Quality Management(2011) |
24. 余孟修;張煒嵩;Chiuh-Cheng Chyu, 彈性流線型工廠排程派工法則選擇之研究-以TFT-LCD偏光板製程為例, 第七屆台灣作業研究學會年會暨學術研討會, 201106 |
25. 李文仙;張煒嵩;Chiuh-Cheng Chyu, 模糊多準則決策方法評選TFT-LCD黃光製程之濕式機台, 第七屆台灣作業研究學會年會暨學術研討會, 201106 |
26. C. C. Chyu,Wei-Shung Chang, A Competitive Evolution Strategy Memetic Algorithm for Unrelated Parallel Machine Scheduling to Minimize Total Weighted Tardiness and Flow Time, The 40th International Conference On Computers And Industrial Engineering, 201007 |
27. 徐志進;方英傑;徐旭昇, 分期付款最大利潤現值資源限制專案排程解算之研究, 第六屆台灣作業研究學會年會暨學術研討會, 201006 |
28. 張煒嵩;徐旭昇, 應用資料包絡分析法之保證區域模式評估多個排程方案效率之研究-以TFT-LCD偏光板裁切製程為例, 第九屆中華決策科學學會年會暨學術研討會, 201006 |
29. 陳博文;陳芝傑;徐旭昇, TFT-LCD Cell 製程生產排程及機台配置之決策分析, 第六屆台灣作業研究學會年會暨學術研討會, 201006 |
30. 張煒嵩;Chiuh-Cheng Chyu, 競爭式演化演算法於多目標動態彈性流線型生產排程問題之研, 中國工業工程學會年會暨學術研討會, 201012 |
31. Chiuh-Cheng Chyu;Wei-Shung Chang;Ruei-Chi Li, Archived Simulated Annealing with Two-Phase Matching Improvement for Unrelated Parallel Machine Scheduling to Minimize Fuzzy Makespan and Average Tardiness, The 2th International Conference on Engineering Opti |
32. 黃文洲;Chiuh-Cheng Chyu;張煒嵩, 多目標彈性零工型排程問題解算之研究, 中國工業工程學會年會暨學術研討會, 201012 |
33. Chiuh-Cheng Chyu;Zhi-Jie Chen, Parallel population Evolution Algorithm for the Time-Cost Trade-off Relation Project Scheduling Problem, The 2th International Conference on Engineering Optimization, 201009 |
34. Wei-Shung Chang;Chiuh-Cheng Chyu;Ruei-Chi Li, Archived Simulated Annealing for Unrelated Parallel Machine Scheduling to Maxiimize Satisfaction of Makespan and Tardiness, The 11th Asia Pacific Industrial Engineering & Management Systems Conference, 201012 |
35. I-Ping Huang;Chiuh-Cheng Chyu,A Bi-objective Economic Model for Two-Level Supply Chain Production Process,The 39th International Conference On Computers And Industrial Engineering,200907 |
36. Chiuh-Cheng Chyu;Wei-Shung Chang,Minimizing total weighted tardiness and flow time for unrelated parallel machines scheduling with matching-improvement evolutionary algorithms,The 13th IFAC Symposium on Information Control Problem in Manufacturing,200906 |
37. I-Ping Huang;C. C. Chyu, A Case Study of Improving Producer’s Inspection Policy for C2F6 Gas used in Semiconductor Manufacturing, International Symposium of Quality Management, 200911 |
38. Wei-Shung Chang;C. C. Chyu, Simulated Annealing for the Fuzzy Bi-objective Unrelated Parallel Machine Scheduling, The 10th Asia Pacific Industrial Engineering & Management Systems Conference, 200912 |
39. Zhi-Jie Chen;C. C. Chyu, A Memetic Algorithm for Minimizing the Total Cost of the Multi-Mode Resource-constrained Project Scheduling Problem Subject to a Deadline, The 10th Asia Pacific Industrial Engineering & Management Systems Conference, 200912 |
40. 張煒嵩;徐旭昇, 演化式演算法於多目標彈性流線型生產排程問題解之研究, 第六屆台灣作業研究學會理論與實務學術研討會, 200911 |
41. 張煒嵩;徐旭昇;鍾愛蓮, 柏拉圖保存式演化策略演算法求解模糊多目標非相關平行機台問題, 中國工業工程學會98年度年會暨學術研討會, 200912 |
42. Zhi-Jie Chen;Chiuh-Cheng Chyu,Performance evaluation of various hybrid algorithms for the multi-mode resource constrained project scheduling problem with cost minimization objective,The 38th International Conference On Computers And Industrial Engineering,200810 |
43. Wei-Shung Chang;Chiuh-Cheng Chyu,A Multi-Criteria Decision Making for the Unrelated Parallel Machines Scheduling Problem,The 38th International Conference On Computers And Industrial Engineering,200810 |
44. Ying-Chieh Fang;Chiuh-Cheng Chyu,A population learning algorithm for the time/cost trade-offs resource constrained project scheduling problem,The 9th Asia Pacific Industrial Engineering & Management Systems Conference,200812 |
45. Wei-Shung Chang;Chiuh-Cheng Chyu,Comparison between SA-based and EA-based Metaheuristics for Solving a Biobjective Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Time,The 9th Asia Pacific Industrial Engineering & Management Systems Conference,200812 |
46. 陳芝傑;徐旭昇;何俊明,多專案維修作業排程結合多目標決策之研究,中國工業工程學會97年度年會暨學術研討會,200812 |
47. 張煒嵩;徐旭昇;陳建隆,基因演算法於多目標TFT-LCD模組廠排程問題之研究,中國工業工程學會97年度年會暨學術研討會,200812 |
48. 黃一平;徐旭昇,利用貝氏方法建立TFT-LCD 產品保固期選擇模式,中國工業工程學會97年度年會暨學術研討會,200812 |
49. Wei-Shung Chang;Pong-Yeng Lei;Chiuh-Cheng Chyu, Local Search Based Metaheuristics for the Multi-Source Capacitated Facility Location Problem,Information Science and Management Conference,2007/7 |
50. Zhi-Jie Chen;Chiuh-Cheng Chyu, A Branch And Bound Heuristic With Failures-Dependent Probability Jumping Rule For The Multi-Mode Resource Constrained Project Scheduling Problem,The 8th Asia Pacific Industrial Engineering & Management System And 2007 Chinese Institute Of Industrial Engineers Conference |
51. Chiuh-Cheng Chyu, Pong-Yang Lei,Hybrid Evolutionary Algorithms for the Multi-Mode Resource-Constrained Project Scheduling Problem with the Objective to Minimize Execution Cost within a Due Date,The annual international conference of the German Operations Research Society |
52. Wei-Shung Chang;Chiuh-Cheng Chyu, Minimizing The Makespan Of The Material Constrained Component Scheduling Problem : A Case Of Multiple Identical PCBs Per Unit Assembly With Identical Machines In Series,The 8th Asia Pacific Industrial Engineering & Management System And 2007 Chinese Institute Of Industrial Engineers Conference |
53. Chiuh-Cheng Chyu, Zhi-Jie Chen;Pong-Yang Lei,Solving The Time/Cost Trade-Off Project Scheduling Problem With Renewable Resource Constraints And A Project Deadline,Operations Research Society Of Taiwan Conference 2007 INFORMS Taiwan Chapter 2007 Annual Meeting |
54. Zhi-Jie Chen;Chiuh-Cheng Chyu, Variable Neighborhood Search For A Payment Model In The Resource-Constrained Project Scheduling Problem With Simple Discount Rate,The 37th International Conference On Computers And Industrial Engineering |
55. 黃一平;徐旭昇,貝式方法於選別型雙次抽樣檢驗計畫之設計,台灣作業研究學會2007年學術研討會暨年會 |
56. Chiuh-Cheng Chyu, Angela H.L. Chen, Zhi-Jie Chen, Hsin-Hui Lin, “A Two-Phase Method for the Multi-Mode Resource-Constrained Project Scheduling Problem,” The 36th International Conference on Computers & Industrial Engineering, Taipei, Taiwan, June 21-23, 2006 |
57. 雷鵬遠;張煒嵩;徐旭昇,模擬退火演算法求解多源容量限制設施選位問題,中國工業工程學會95年度年會暨工業工程與管理精緻化與新方向學術研討會,2006/12 |
58. Chiuh-Cheng Chyu and Wei-Shung Chang, “A hybrid genetic algorithm for the operational sequence of a high speed chip placement machine,” The 36th International Conference on Computers & Industrial Engineering, Taipei, Taiwan, June 21-23, 2006 |
59. W.-S Chang;P.-Y Lei;C.-C. Lu;Chiuh-Cheng Chyu, Simulated Annealing Algorithms for the Multi-Source Capacitated Warehouse Location Problem,The 7th Asia-Pacific Conference on Industrial Engineering and Management Systems Conference 2006,2006/12 |
60. 雷鵬遠;張煒嵩;徐旭昇,變動臨域搜尋法求解多源容量限制設施選位問題,2006台灣作業研究學會學術演討會,2006/11 |
61. I.-P. Huang;Chiuh-Cheng Chyu, Economic Design of a Rectifying Inspection Sampling Procedure for Single Specification Limit Products,The 11th Annual International Conference on Industrial Engineering Theory,2006.10 |
62. 黃一平;徐旭昇,加劇產品失效成本抽樣檢驗計畫之設計 - 元件功能值變異數未知,2006台灣作業研究學會學術演討會,2006/11 |
63. C.-C. Chyu, A. H.L. Chen, and X.-H. Lin, “A Hybrid Ant Colony Approach to Multi-mode Resource-Constrained Project Scheduling Problems with non-renewable types,” 1st International Conference on Operations and Supply Chain Management, Bali, Dec. 14-15, 2005 |
64. C.-C. Chyu, A. H.L. Chen, and Zhi-Jie Chen, “A Mixed Strategy Genetic Local Search Algorithm for the Resource-Constrained Project Scheduling Problem,” The Sixth Asia-Pacific Conference on Industrial Engineering and Management Systems (APIEMS), Manila, Phi |
65. 陳芝傑、陳香伶、徐旭昇,「瀰集進化演算法求解多資源限制專案排程問題」,第二屆台灣作業研究學會年會暨作業研究理論與實務學術研討會,國立政治大學,Dec. 4,2005 |
66. C.-C. Chyu, A. H.L. Chen, and Zhi-Jie Chen, “Memetic algorithms for the resource-constrained project scheduling problem,” IFORS Triennial, Haiwai, July 11-15, 2005. |
67. 徐旭昇,「組件品質特性屬常態分配下戴明成本模式之貝氏分析」,第一屆台灣作業研究學會學術研討會暨2004年科技與管理學術研討會,台北科技大學,Nov. 12, 2004. |
68. C.-C. Chyu, “An Economical Inspection Sampling Model for a Product Containing Series-Structured Components,” The Fifth Asia-Pacific Conference on Industrial Engineering and Management Systems (APIEMS), Dec. 12~14, 2004, Gold Coast, Australia. |
69. 徐旭昇、陳彥芬,「基因區域最佳化解算印刷電路板高速機置件順序問題之效果分析 - 同類型元件可分機分槽擺置情況」,工業工程學會九十三年學術研討會,成功大學,Dec. 18,2004. (NSC 92-2213-E-155-039) |
70. C.-C. Chyu and C.-C. Lin, “An Integrated Optimization Algorithm for Printed Circuit Board Assembly: A Case with Multiple Board Types,” The 33th Computer & Industrial Engineering International Conference, March 2004, Jeju, Korea. |
71. F.-C. Wu and C.-C. Chyu, “A Generalized Optimal Approach to Robust Design with Multiple Quality Characteristics,” International Conference of Industrial Engineering and Engineering Management: Global Industrial Engineering in e-Century, Shanghai, P. R. Ch |
72. Y.-C. Fang and C.-C. Chyu, “An Ant Colony Optimization Algorithm for the PCB Assembly Using a Turret Style Surface Mount Placement Machine,” The 8th Annual International Conference on Industrial Engineering, Theory, Applications and Practice, Nov. 10~12, |
73. C.-C. Chyu, I.-C. Yu, and J.-Y. Shao, “Bayesian Analysis of the Rectifying Variables Sampling Plan under Normality Assumption with Unknown Variance,” The Fourth Asia-Pacific Conference on Industrial Engineering and Management Systems (APIEMS), Dec. 20, 20 |
74. J. Ting and C. C. Chyu, "Production Planning Problems in Printed Circuit Board Assembly," 2001 PCB Manufacturing Technology Seminar, pp. 12-19, Yuan-Ze University, June 23, 2001. |
75. W. S. Chen and C. C. Chyu, "Production Planning in PCB Manufacturing for Low-Volume High-Variety Demand Under Single Placement Machine," 2001 PCB Manufacturing Technology Seminar, pp. 20-27, Yuan-Ze University, June 23, 2001. |
C. 獎項 1. 陳昶宏;莊逸琦;戎啟安, 工管系, 佳作(2012) |
2. The best paper award of the NOC prize,2009,7(The 13th IFAC Symposium on Information Control Problems in Manufacturing (INCON'09) |